General Information or Other Event Number: 43155
Rep Org: FLORIDA BUREAU OF RADIATION CONTROL
Licensee: CAPTECH
Region: 1
City: TALLAHASSEE State: FL
County:
License #: 2608-1
Agreement: Y
Docket:
NRC Notified By: STEVE FURNACE
HQ OPS Officer: STEVE SANDIN
Notification Date: 02/08/2007
Notification Time: 11:57 [ET]
Event Date: 02/06/2007
Event Time: 11:00 [EST]
Last Update Date: 02/08/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
AGREEMENT STATE
Person (Organization):
WILLIAM COOK (R1)
GREG MORELL (NMSS)

Event Text

AGREEMENT STATE REPORT INVOLVING PERSONNEL EXTREMITY OVEREXPOSURE

"[Captech representative] reported an overexposure to a Captech employee. [The individual] received 50.68 rem to her left hand as per her dosimetry report. [The individual] is no longer an employee at Captech [and] left at her own volition as per [the Captech representative]. Incident referred to radioactive materials for investigation."

Captech is an independent Nuclear Pharmacy. The individual receiving the overexposure handled various isotopes during the period measured by the dosimetry report.

FL Incident No.: FL07-019

To top of page
Power Reactor Event Number: 43164
Facility: DAVIS BESSE
Region: 3 State: OH
Unit: [1] [ ] [ ]
RX Type: [1] B&W-R-LP
NRC Notified By: CRAIG A. GILLIG
HQ OPS Officer: STEVE SANDIN
Notification Date: 02/13/2007
Notification Time: 23:05 [ET]
Event Date: 02/13/2007
Event Time: 20:12 [EST]
Last Update Date: 02/13/2007
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
MARK RING (R3)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation

Event Text

LOSS OF OFFSITE COMMUNICATIONS CAPABILITY DUE TO A POWER OUTAGE IN TOLEDO, OHIO

"Due to a power outage offsite, the Davis-Besse Nuclear Power Station has experienced a loss of offsite communications capability, which is reportable within eight hours under 10 CFR 50.72(b)(3)(xiii). A loss of a minimum of two of three available telephone system pathways constitutes a loss of offsite communications capability under Davis-Besse site specific requirements (DBRM-RC-0001 R01 Attachment 10). As of 2012 on February 13, 2007, two of the three telephone pathways were unavailable. Full telephone service was restored at 2214 on February 13, 2007.

"Due to the loss of the telephone systems, the site also lost the capability to page the Emergency Response Organization via the Computerized Automated Notification System (CANS) in the event of an emergency declaration. However, the site retained the ability to group page the Emergency Response Organization via alternate means. In addition, due to an ongoing snow storm, the site has elected to augment on-shift personnel with selected key Emergency Response Organization personnel.

"The Emergency Notification System is currently available."

The licensee informed the State of Ohio, local authorities and the NRC Resident Inspector.