Event Notification Report for May 20, 2002

                         
                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           05/17/2002 - 05/20/2002

                              ** EVENT NUMBERS **

38602  38819  38908  38909  38925  38927  38928  38929  38930  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38602       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CRYSTAL RIVER            REGION:  2  |NOTIFICATION DATE: 01/01/2002|
|    UNIT:  [3] [] []                 STATE:  FL |NOTIFICATION TIME: 10:08[EST]|
|   RXTYPE: [3] B&W-L-LP                         |EVENT DATE:        01/01/2002|
+------------------------------------------------+EVENT TIME:        09:19[EST]|
| NRC NOTIFIED BY:  BILL BANDHAUER               |LAST UPDATE DATE:  05/19/2002|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |ANNE BOLAND          R2      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|3     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION DUE RESCUED SEA TURTLE                                  |
|                                                                              |
| EN #37902 started the biennial report period.                                |
|                                                                              |
| On January 1, 2002 at 0919, a rescued sea turtle was identified as a green   |
| sea turtle.  This is the 62nd rescue of a live sea turtle at Crystal River   |
| Unit 3 (CR-3) in this biennial period. Notification to the National Marine   |
| Fisheries Service and the Florida Fish and Wildlife Conservation Commission. |
|                                                                              |
|                                                                              |
| The licensee intends to notify the NRC Resident Inspector.                   |
|                                                                              |
| * * *  UPDATE ON 1/05/02 @ 1002 BY RAWLS TO GOULD  * * *                     |
|                                                                              |
| On January 5, 2002, at 0720, a rescued sea turtle was identified as a        |
| Loggerhead Sea Turtle. This is the 63rd rescue of a live sea turtle at       |
| Crystal River Unit 3 (CR3) in this biennial period.  This is reportable as a |
| 4-hour report under 10 CFR 50.72(b)(2)(xi) as this event is related to the   |
| protection of the environment for which a notification to other government   |
| agencies (National Marine Fisheries Service and Florida Fish and Wildlife    |
| Conservation Commission) has been or will be made.                           |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Reg 2 RDO (Decker) was notified.                                             |
|                                                                              |
| * * * UPDATE ON 01/09/02 @ 1107 EST BY ANDY BARNES TAKEN BY MACKINNON * * *  |
|                                                                              |
| On January 9, 2002, at 0838, a rescued sea turtle was identified as a Kemp's |
| Ridley Sea Turtle. This is the 64th rescue of a live turtle at Crystal River |
| Unit 3 (CR-3) in this biennial period. This is reportable as a 4-hour 10 CFR |
| 50.72(b)(2)(xi) as this event is related to the protection of the            |
| environment for which a notification to other government agencies (National  |
| Marine Fisheries Service and Florida Fish and Wildlife Conservation          |
| Commission) has been or will be made.                                        |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Reg 2 (Brian Bonser) was notified.                                           |
|                                                                              |
| * * * UPDATE ON 02/17/02 at 0940 EST BY RICKY RAWLS TO FANGIE JONES * * *    |
|                                                                              |
| "On February 17, 2002 at 0820, a rescued injured sea turtle was identified   |
| as a Kemp's Ridley Sea Turtle. The injury will require transportation to     |
| Clearwater Marine Science Center or Florida Fish and Wildlife Conservation   |
| Refuge. The Injury appears to be from a boat propeller. This is the 65th     |
| rescue of a live sea turtle at Crystal River Unit 3 (CR-3) in this biennial  |
| period. This is Reportable as a 4-Hour Report under 10 CFR 50.72(b)(2)(xi)   |
| as this event is related to the protection of the environment for which a    |
| notification to other government agencies (National Marine Fisheries Service |
| and Florida Fish and Wildlife Conservation Commission) has been or will be   |
| made. This Is an update to event 38602."                                     |
|                                                                              |
| The NRC Resident Inspector will be notified.  R2DO (Stephen Cahill) has been |
| notified.                                                                    |
|                                                                              |
| * * * UPDATE ON 03/01/02 AT 1122 EST BY RICKY RAWLS TO GERRY WAIG * * *      |
|                                                                              |
| "On March 1, 2002 at 0952, a healthy rescued sea turtle was identified as a  |
| Green Sea Turtle. This is the 66th rescue of a live sea turtle at Crystal    |
| River Unit 3 (CR-3) in this biennial period. This is Reportable as a 4-Hour  |
| Report under 10 CFR 50.72(b)(2)(xi) as this event is related to the          |
| protection of the environment for which a notification to other government   |
| agencies (National Marine Fisheries Service and Florida Fish and Wildlife    |
| Conservation Commission) has been or will be made. This is an update to      |
| event 38602."                                                                |
|                                                                              |
| The NRC Resident Inspector was notified. R2DO (Julian) was notified.         |
|                                                                              |
| * * * UPDATE ON 03/07/02 AT 1114 EST BY CHUCK MORRIS TO MIKE NORRIS * * *    |
|                                                                              |
| "On March 7, 2002 at 0835, two healthy sea turtles rescued at CR#3 were      |
| identified as Green Sea Turtles. These are the 67th and 68th live sea turtle |
| rescues at the Crystal River Energy Complex in this biennial period. This is |
| Reportable as a 4-Hour Report under 10 CFR 50.72(b)(2)(xi) as this event is  |
| related to the protection of the environment for which a notification to     |
| other government agencies (National Marine Fisheries Service and Florida     |
| Fish and Wildlife Conservation Commission) has been or will be made. This is |
| an update to event 38602."                                                   |
|                                                                              |
| The NRC Resident Inspector was notified. R2DO (Henson) was notified.         |
|                                                                              |
| * * * UPDATE ON 04/02/02 at 0408 EST BY RICKY RAWLS TO FANGIE JONES * * *    |
|                                                                              |
| "On April 2, 2002 at 0236, two sea turtles previously rescued at CR#3 intake |
| area were identified by FPC Mariculture staff as Kemp Ridley Sea Turtles.    |
| One of the turtles appears to be in distress and may require transportation  |
| to Clearwater Marine Science Center of Florida Fish and Wildlife             |
| Conservation Refuge. These are the 69th and 70th live sea turtle rescues at  |
| the Crystal River Energy Complex in this biennial period. This is Reportable |
| as a 4-Hour Report under 10 CFR 50.72(b)(2)(xi) as this event is related to  |
| the protection of the environment for which a notification to other          |
| government agencies (National Marine Fisheries Service and Florida Fish and  |
| Wildlife Conservation Commission) has been or will be made. This is an       |
| update to event 38602."                                                      |
|                                                                              |
| The NRC Resident Inspector will be notified.  The R2DO (Carolyn Evans) was   |
| notified.                                                                    |
|                                                                              |
| ***** UPDATE AT 1023 EDT ON 05/19/02 FROM PELLERIN TO LEIGH TROCINE *****    |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On May 19, 2002, at 0916, a sea turtle previously rescued at CR#3 intake    |
| area was identified by FPC Mariculture staff as Green Sea Turtle.  This is   |
| the 71st live sea turtle rescue at the Crystal River Energy Complex in this  |
| biennial period.  This is Reportable as a 4-Hour Report under 10 CFR         |
| 50.72(b)(2)(xi) as this event is related to the protection of the            |
| environment for which a notification to other government agencies (National  |
| Marine Fisheries Service and Florida Fish and Wildlife Conservation          |
| Commission) has been or will be made.  This is an update to event 38602."    |
|                                                                              |
| The licensee plans to notify the National Marine Fisheries Service and       |
| Florida Fish and Wildlife Conservation Commission and the NRC resident       |
| inspector.  The NRC operations officer notified the R2DO (Paul Fredrickson). |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38819       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: POINT BEACH              REGION:  3  |NOTIFICATION DATE: 04/01/2002|
|    UNIT:  [1] [2] []                STATE:  WI |NOTIFICATION TIME: 13:05[EST]|
|   RXTYPE: [1] W-2-LP,[2] W-2-LP                |EVENT DATE:        04/01/2002|
+------------------------------------------------+EVENT TIME:        09:17[CST]|
| NRC NOTIFIED BY:  THOMAS JESSESSKY             |LAST UPDATE DATE:  05/17/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DAVID HILLS          R3      |
|10 CFR SECTION:                                 |                             |
|AUNA 50.72(b)(3)(ii)(B)  UNANALYZED CONDITION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| NITROGEN BACKUP SYSTEM FOR CHARGING PUMP SPEED CONTROL FOUND NOT TO
SATISFY  |
| APPENDIX R  FIRE ASSUMPTION.                                                 |
|                                                                              |
| At 0917 CT on 04/01/02, it was determined that a condition identified on     |
| 03/28/02 potentially represents a significant degradation of plant safety    |
| during response to an Appendix R event. The Appendix R credited nitrogen     |
| backup system for charging pump speed control is unable to satisfy its       |
| design function of controlling Charging System flow to the Reactor Coolant   |
| System (RCS) for the time required to place the plant in Mode 5 (Cold        |
| Shutdown).  During an Appendix R fire it is assumed that the normal motive   |
| force (instrument air) for charging control is unavailable and an installed  |
| backup is credited.  This installed nitrogen system allows inventory control |
| while in Mode 3 (Hot Standby) and is used to control RCS inventory and       |
| pressure while the RCS is cooled down and depressurized from Mode 3 (Hot     |
| Standby) to Mode 5 (Cold Shutdown).  A nitrogen bottle 12-pack is calculated |
| to last for approximately 8 hours. PBNP has 1 spare approved nitrogen pack   |
| on site - - it has been calculated that up to 15 spares would be required    |
| for 72 hours of charging pump operation.  Mode 5 (Cold Shutdown) is expected |
| to be reached in 30 hours but may be as long as 72 hours.                    |
|                                                                              |
| This issue places the plant in an unanalyzed condition that has the          |
| potential to significantly degrade plant safety (RCS Inventory Control) and  |
| thus is reportable.                                                          |
|                                                                              |
| The associated charging pumps have been declared out of service for Appendix |
| R use and compensatory actions undertaken that establish appropriate fire    |
| rounds.  Fire rounds will be continued until the condition is corrected or a |
| suitable evaluation is completed.                                            |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
|                                                                              |
| ****RETRACTION ON 5/17/02 AT 13:10 FROM R. Robbins to R. Laura****           |
|                                                                              |
| "ENS Event Notification #38819 was reported at 1205 CST on April 1, 2002.    |
| This event was reported in accordance with 10 CFR 50.72(b)(3)(ii)(B) for     |
| identification of an unanalyzed condition that had the potential to          |
| significantly degrade plant safety. The condition involved postulated        |
| Appendix R fire scenarios for which the safe shutdown analyses assumes that  |
| the normal motive force for charging pump control (instrument air) is        |
| unavailable due to fire-induced damage. Certain Appendix R fire scenarios    |
| require the availability of a single charging pump, operable at greater than |
| minimum pump capacity, in order to meet the Appendix R performance goal of   |
| maintaining adequate RCS inventory control without loss of pressurizer       |
| level. An installed back-up nitrogen supply is credited with maintaining the |
| ability to control charging pump flow for the duration of the 72 hour        |
| Appendix R coping period. The unanalyzed condition identified in this        |
| notification was that the installed back-up nitrogen supply, based on a      |
| conservative calculation, would have adequate capacity to provide the motive |
| force for the Single Charging pump control function for only 8 hours. After  |
| that time, the variable speed charging pump would run back to minimum speed, |
| which equates to a pumping capacity of approximately 18 gpm.                 |
|                                                                              |
| "We have subsequently completed an engineering evaluation to estimate the    |
| transient behavior of the RCS in the event of these Appendix R fire          |
| scenarios assuming only 8 hours of Charging pump speed control is available. |
| This evaluation was based on conservative assumptions regarding reactor      |
| coolant pump seal leakage and unavailability of normal cooling and safety    |
| systems. This evaluation provided estimates of key RCS transient parameters  |
| based on engineering analysis and predicts that upon reducing the available  |
| charging pump flow to the pump minimum, pressurizer pressure and level will  |
| no longer be maintained. Although RCS sub-cooling is lost and some voiding   |
| in the RCS occurs, the core remains covered during the entire 72 hour        |
| Appendix R coping period and core cooling is maintained throughout the       |
| transient.                                                                   |
|                                                                              |
| "We have therefore concluded that this previously unanalyzed Appendix R      |
| scenario would not have resulted in a condition that would have              |
| significantly degraded plant safety. Therefore, this condition is not        |
| reportable under 10 CFR 50.72 and we are hereby retracting this event        |
| notification.                                                                |
|                                                                              |
| "Until corrective actions are completed to ensure that the Appendix R safe   |
| shutdown performance goal to maintain reactor coolant inventory control      |
| within the level indication in the pressurizer can be satisfied, appropriate |
| fire rounds will continue."                                                  |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Notified R3DO (R. Gardner)                                                   |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Hospital                                         |Event Number:   38908       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  GEORGE WASHINGTON UNIV. HOSPITAL     |NOTIFICATION DATE:
05/09/2002|
|LICENSEE:  G.W. UNIV. HOSPITAL                  |NOTIFICATION TIME: 16:25[EDT]|
|    CITY:  WASHINGTON DC            REGION:  1  |EVENT DATE:        05/09/2002|
|  COUNTY:                            STATE:  DC |EVENT TIME:        10:30[EDT]|
|LICENSE#:  08-30607-01           AGREEMENT:  N  |LAST UPDATE DATE:  05/17/2002|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |MICHELE EVANS        R1      |
|                                                |DOUG BROADDUS        NMSS    |
+------------------------------------------------+JOE HOLONICH         IRO     |
| NRC NOTIFIED BY:  ANIS CHOWDHURG               |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|BAE1 20.2202(b)(1)       PERS OVEREXPOSURE/TEDE |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PRELIMINARY ESTIMATED EXPOSURE OF 63 ROENTGEN TO THE HANDS OF A
MEDICAL      |
| PHYSICIST                                                                    |
|                                                                              |
|                                                                              |
| While using a Cordis delivery system to insert a ribbon containing Ir-192    |
| seeds into a patient, the ribbon came out into the hands of the Medical      |
| Physicist. The screw and cap of the Cordis delivery system had been loosened |
| and the ribbon containing the Ir-192 seeds was supposed to be pushed into    |
| patient via a catheter but somehow the ribbon containing the Ir-192 seeds    |
| ended up in the hand of the Medical Physicist.   George Washington Hospital  |
| Radiation Safety Officer preliminarily estimated the minimum exposure to the |
| Medical Physicist hand was 63 roentgens.  The Medical Physicist walked 5 or  |
| 6 feet into another room where the Radiation Oncologist was located and      |
| dropped the ribbon to the floor. The Radiation Oncologist, wearing gloves,   |
| picked the ribbon up and placed it in a safe location.  The Radiation Safety |
| Officer for George Washington Hospital said that the Radiation Oncologist    |
| received a dose to his hand while carrying the ribbon.   An estimated dose   |
| calculation to Radiation Oncologist hands, etc., had not been made at the    |
| time of the notification.                                                    |
|                                                                              |
| ****UPDATE ON 5/17/02 at 11:15 FROM A. CHOWDHURY TO R. LAURA****             |
|                                                                              |
| Further licensee investigation revealed that an actual overexposure did not  |
| occur.  The initial calculations of this event were too conservative.  NRC   |
| Region 1 inspectors made a site visit to review this event.                  |
|                                                                              |
| Notified R1DO (D. Holody) and NMSS (D. Cool).                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   38909       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  ROCKWELL AUTOMATION                  |NOTIFICATION DATE: 05/09/2002|
|LICENSEE:  ROCKWELL AUTOMATION                  |NOTIFICATION TIME: 16:30[EDT]|
|    CITY:  FLOWERY BRANCH           REGION:  2  |EVENT DATE:        05/09/2002|
|  COUNTY:                            STATE:  GA |EVENT TIME:             [EDT]|
|LICENSE#:                        AGREEMENT:  Y  |LAST UPDATE DATE:  05/17/2002|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |VERN HODGE           NRR     |
|                                                |                             |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JAMES THIGPEN                |                             |
|  HQ OPS OFFICER:  RICH LAURA                   |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|CCCC 21.21               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PART 21 ISSUE ON ELECTRIC  MOTORS                                            |
|                                                                              |
| Rockwell Automations report a potential defect involving insufficient slot   |
| fill in electric motor windings used to drive fan assemblies.  They have     |
| contacted Hayden Company located in New Philadelphia, Ohio who was supplied  |
| with these motors.  The motors may be in use at commercial nuclear power     |
| plants.                                                                      |
|                                                                              |
| ***UPDATE Curt Pratt  to Mike Norris 5/16/02 13:59 EDT***                    |
|                                                                              |
| This update listed the Licensees  that have these motors:  Davis Besse,      |
| Oconee and Braidwood.                                                        |
| Notified NRR (Hodges) , Reg 2 RDO(Fredrickson) and Reg 3 RDO(Gardner).       |
|                                                                              |
| ****UPDATE J. Thigpen to R. Laura on 5/17/02 at 13:19 by fax*****            |
|                                                                              |
| The licensee identified 1 additional motor and the customer was the same as  |
| the others.                                                                  |
|                                                                              |
| Notified NRR (Hodges)                                                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38925       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 05/17/2002|
|    UNIT:  [1] [] []                 STATE:  TX |NOTIFICATION TIME: 14:55[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        05/17/2002|
+------------------------------------------------+EVENT TIME:        11:30[CDT]|
| NRC NOTIFIED BY:  GERALD HILDEBRANDT           |LAST UPDATE DATE:  05/17/2002|
|  HQ OPS OFFICER:  RICH LAURA                   +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:                                |GREG PICK            R4      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EP SIREN INADVERTENTLY ACTUATED FOR ONE MINUTE PROMPTING AN OFFSITE       
  |
| NOTIFICATION                                                                 |
|                                                                              |
| "A South Texas Project Offsite Emergency Notification siren was              |
| inadvertently going off. The Matagorda County Sheriffs office notified the   |
| station a siren had activated for approximately 1 minute. This happened at   |
| the same time a thunderstorm was moving through the area. Onsite personnel   |
| have verified the sirens are operational and in a standby condition. The     |
| Matagorda County Sheriffs office was the only offsite agency that was        |
| contacted during this event."                                                |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38927       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: LIMERICK                 REGION:  1  |NOTIFICATION DATE: 05/19/2002|
|    UNIT:  [1] [] []                 STATE:  PA |NOTIFICATION TIME: 03:33[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        05/19/2002|
+------------------------------------------------+EVENT TIME:        00:54[EDT]|
| NRC NOTIFIED BY:  PETE GARDNER                 |LAST UPDATE DATE:  05/19/2002|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DANIEL HOLODY        R1      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     A/R        Y       94       Power Operation  |0        Hot Shutdown     |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC REACTOR SCRAM DUE TO A TURBINE TRIP FOR UNKNOWN REASONS       
    |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "[A] Unit-1 reactor scram occurred at 0054 hours on May 19, 2002.  The       |
| reactor scram occurred as a result of a main turbine trip.  The cause of the |
| turbine trip is under investigation.  All systems actuated as designed.  The |
| unit is being maintained in Hot Shutdown at normal [reactor pressure vessel] |
| level.  This report is being made pursuant to [10 CFR] 50.72(b)(2)(iv)(B)    |
| due to actuation of the reactor protection system (RPS).  No [safety relief  |
| valves] lifted, and currently [one] reactor recirculation pump has been      |
| restarted[.  The] scram has been reset."                                     |
|                                                                              |
| The licensee stated that reactor vessel level control is currently being     |
| maintained via normal condensate and feedwater.  The main steam isolation    |
| valves are open, the condenser is available as a heat sink, and reactor      |
| vessel pressure control is being maintained via normal electrohydraulic      |
| control pressure control.  Containment parameters are normal.  The licensee  |
| also stated that the all control rods fully inserted, that there were no     |
| engineered safety feature actuations or emergency core cooling system        |
| injections, and that none were required.  There was nothing unusual or not   |
| understood with the exception of the cause of the turbine trip.              |
|                                                                              |
| Prior to this event, the unit had been operating at reduced power to         |
| facilitate the performance of turbine stop valve testing.  The licensee      |
| stated that a combined intermediate valve (CIV) was being stroked at the     |
| time of the turbine trip/reactor scram but that stroking of the CIV is       |
| currently believed to be unrelated to the turbine trip.  At this time, the   |
| licensee believes that the cause of the turbine trip may have been related   |
| to the thrust bearing wear detector.  However, the final root cause of the   |
| turbine trip remains under investigation.                                    |
|                                                                              |
| The licensee notified the NRC resident inspector, applicable State and local |
| agencies (including Montgomery, Chester, and Berks Counties), and the        |
| Pennsylvania Emergency Management Agency.                                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38928       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEQUOYAH                 REGION:  2  |NOTIFICATION DATE: 05/19/2002|
|    UNIT:  [] [2] []                 STATE:  TN |NOTIFICATION TIME: 06:03[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        05/19/2002|
+------------------------------------------------+EVENT TIME:        04:47[EDT]|
| NRC NOTIFIED BY:  MICHAEL HOWARD               |LAST UPDATE DATE:  05/19/2002|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |PAUL FREDRICKSON     R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     M/R        Y       0        Startup          |0        Hot Standby      |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MANUAL REACTOR TRIP DUE TO A CONTROL ROD SYSTEM URGENT FAILURE ALARM
DURING  |
| LOW POWER PHYSICS TESTING                                                    |
|                                                                              |
| While in Mode 2 (Startup) with reactor power at 10E-6 in the intermediate    |
| range as part of a refueling outage, Unit 2 was manually tripped at 0447 EDT |
| on 05/19/02.  During the performance of low power physics testing, the unit  |
| experienced a control rod system urgent failure alarm.  Operators were       |
| inserting  Shutdown Bank 'B,' and the Shutdown Bank 'B' Group 2 step counter |
| failed to step.  Rod movement was stopped.  After performance of an          |
| evaluation, operators noticed that reactivity was increasing slightly.       |
| Operators then attempted to insert Control Bank 'D,' and the Control Bank    |
| 'D' Group 2 step counter also failed to step.  After evaluating rod control  |
| problems, the reactor was manually tripped.                                  |
|                                                                              |
| All control rods fully inserted as a result of the manual reactor trip, and  |
| all systems functioned as required.  There were no engineered safety feature |
| actuations or emergency core cooling system injections, and none were        |
| required.  The licensee currently suspects that there may be a blown fuse in |
| the rod control cabinet.  The investigation is currently underway.           |
|                                                                              |
| The unit is currently stable in Mode 3 (Hot Standby).  Normal charging and   |
| makeup, pressurizer heaters and sprays, and the reactor coolant pumps are    |
| being utilized for primary system inventory, pressure, and transport         |
| control.  Main feedwater is supplying water to the steam generators, and     |
| secondary steam is being dumped to the condenser.  Containment parameters    |
| are also normal.                                                             |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38929       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 05/19/2002|
|    UNIT:  [1] [] []                 STATE:  CA |NOTIFICATION TIME: 20:59[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        05/19/2002|
+------------------------------------------------+EVENT TIME:        16:00[PDT]|
| NRC NOTIFIED BY:  STEVE DAVID                  |LAST UPDATE DATE:  05/19/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |GREG PICK            R4      |
|10 CFR SECTION:                                 |                             |
|AUNA 50.72(b)(3)(ii)(B)  UNANALYZED CONDITION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| GREATER THAN 1% OF STEAM GENERATOR 1-2 TUBES ARE DEFECTIVE                   |
|                                                                              |
| On May 19, 2002, during the Unit 1 eleventh refueling outage, analysis of    |
| eddy current data on steam generator (SG) 1-2 indicated that greater than    |
| one percent of the total tubes inspected on SG 1-2 were defective.           |
| Thirty-six (36) defective tubes in SG 1-2 were detected and are being        |
| plugged.  Most of the pluggable indications are due to outside diameter      |
| stress corrosion cracking at the tube support plate intersections.  Review   |
| of the eddy current inspections are complete.  Results of the SG tube        |
| inspection fall into Category C-3, which requires a 4-hour non-emergency     |
| report in accordance with Technical Specification Table 5.5.9-2 and 10 CFR   |
| 50.72(b)(3)(ii) an 8-hour requirement.                                       |
|                                                                              |
| The other three SGs' tubes have been checked.                                |
|                                                                              |
| An NRC teleconference in accordance with Technical Specification 5.6.10.d to |
| report the results of the voltage-based repair criteria implemented for the  |
| tube support plate intersections is currently scheduled for Monday May 20,   |
| 2002, at 1230 hours EDT.                                                     |
|                                                                              |
| The NRC Resident Inspector will be notified of this event by the licensee.   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38930       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CALLAWAY                 REGION:  4  |NOTIFICATION DATE: 05/20/2002|
|    UNIT:  [1] [] []                 STATE:  MO |NOTIFICATION TIME: 05:43[EDT]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        05/20/2002|
+------------------------------------------------+EVENT TIME:        05:00[CDT]|
| NRC NOTIFIED BY:  GARY OLMSTEAD                |LAST UPDATE DATE:  05/20/2002|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |GREG PICK            R4      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PLANNED MAINTENANCE RESULTING IN THE LOSS OF AN EMERGENCY RESPONSE
FACILITY  |
| FOR THE DURATION OF THE EVOLUTION                                            |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "During performance of planned maintenance, the Emergency Operation Facility |
| (EOF) will be de-energized.  These maintenance activities, including         |
| electrical isolation and restoration, are expected to last approximately 16  |
| hours.  Contingency plans for emergency situations have been established."   |
|                                                                              |
| "This event is reportable per 10CFR50.72(b)(3)(xiii) since this constitutes  |
| a loss of an emergency response facility for the duration of the             |
| evolution."                                                                  |
|                                                                              |
| "The NRC Resident was previously notified that this activity was scheduled   |
| to occur and will be informed of this ENS notification."                     |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021