Event Notification Report for March 6, 2002

                         
                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           03/05/2002 - 03/06/2002

                              ** EVENT NUMBERS **

38610  38634  38732  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38610       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WOLF CREEK               REGION:  4  |NOTIFICATION DATE: 01/06/2002|
|    UNIT:  [1] [] []                 STATE:  KS |NOTIFICATION TIME: 08:43[EST]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        01/06/2002|
+------------------------------------------------+EVENT TIME:        05:15[CST]|
| NRC NOTIFIED BY:  HUBBARD                      |LAST UPDATE DATE:  03/05/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |BLAIR SPITZBERG      R4      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EMERGENCY DIESEL GENERATORS DECLARED INOPERABLE                              |
|                                                                              |
| At 1347 on 1/4/2002, the "A" emergency diesel generator (EDG) was declared   |
| inoperable due to tube degradation identified in the lube oil, intercooler   |
| and jacket water heat exchangers.  Technical Specification 3.8.1 was         |
| entered, the affected heat exchanger tubes were plugged and the "A" EDG was  |
| restored to operable status at 1134 on 1/5/2002.                             |
|                                                                              |
| At 1301 on 1/5/2002, the "B" EDG was taken out of service to perform         |
| inspections of its lube oil, intercooler, and jacket water heat exchangers.  |
| Inspection of the heat exchanger tubes and analysis of the inspection data   |
| found similar results, subsequently resulting in the need to plug heat       |
| exchanger tubes to restore the "B" EDG to operable status.                   |
|                                                                              |
| Based upon the similarity and extent of the tube degradation in both the "A" |
| and "B" EDG heat exchangers, prior to implanting the tube plugging           |
| corrective action, the possibility exists that the degradation of the EDG    |
| heat exchangers' tubes could have prevented the fulfillment of the safety    |
| function of the onsite standby class 1E power source following a design      |
| basis earthquake.                                                            |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| * * * UPDATE ON 01/06/02 AT 1927 EST BY HUBBARD TAKEN BY MACKINNON * * *     |
|                                                                              |
| "B" EDG was restored to operable status.  R4DO (B. Spitzberg) notified.      |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| * * * RETRACTED AT 1826 EST ON 3/5/02 BY STEVE HENRY TO FANGIE JONES * * *   |
|                                                                              |
| Subsequent evaluation of the heat exchangers by the licensee determined that |
| the degradation was not severe enough to interfere with the proper operation |
| of the EDGs.  The licensee is retracting the event notification, as the EDGs |
| were operational and fully available.                                        |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R4DO (Linda Smith)    |
| was notified.                                                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38634       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAINT LUCIE              REGION:  2  |NOTIFICATION DATE: 01/17/2002|
|    UNIT:  [1] [2] []                STATE:  FL |NOTIFICATION TIME: 13:07[EST]|
|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        01/17/2002|
+------------------------------------------------+EVENT TIME:        11:45[EST]|
| NRC NOTIFIED BY:  KELLY KORTH                  |LAST UPDATE DATE:  03/05/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |ROBERT HAAG          R2      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION  INVOLVING RECOVERED SEA TURTLE FROM INTAKE CANAL    
  |
|                                                                              |
| At approximately 1130 EST on 01/17/02, a green sea turtle was retrieved from |
| the intake canal and a determination was made that it was in need of         |
| rehabilitation.  As required by the Plant's Sea Turtle Permit, the Florida   |
| Fish and Wildlife Conservation Commission (FFWCC) was notified at 1145 EST.  |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
|                                                                              |
| See EN #38513 for 2001 occurrences.                                          |
|                                                                              |
| * * * UPDATE ON 1/28/02  @ 1243 BY KORTH TO GOULD * * *                      |
|                                                                              |
| At approximately 1115 on 1/28/02 a loggerhead turtle was retrieved from the  |
| plant's  intake canal.  The turtle was determined to be in need of           |
| rehabilitation.  Per the licensee's turtle permit, the Florida Fish and      |
| Wildlife Conservation Commission (FWCC) was notified at 1125.                |
|                                                                              |
| The NRC Resident Inspector was notified.   Notified Reg 2 RDO (Ninh)         |
|                                                                              |
| * * * UPDATE ON 2/6/02 @ 0853 BY MERRILL TO GOULD * * *                      |
|                                                                              |
| At approximately 0745 on 2/6/02 an injured green sea turtle was rescued from |
| the plant's intake canal.  The turtle was alive, but in need of              |
| rehabilitation.  The turtle will be transported to a facility in Clearwater  |
| for treatment.  The Florida Department of Environmental Protection has been  |
| notified of the event.                                                       |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Notified Reg 2 RDO(Fredrickson)                                              |
|                                                                              |
| * * * UPDATE 1025 3/2/2002 BY R. DIEHL TAKEN BY R. STRANSKY * * *            |
|                                                                              |
| "At approximately 0830 3/2/02 a Loggerhead turtle was retrieved from the     |
| plant's intake canal. The turtle was determined to be in need of             |
| rehabilitation. Per the plant's turtle permit, the Florida Fish and Wildlife |
| Conservation Commission (FWCC) was notified at 0845."                        |
|                                                                              |
| The NRC resident inspector has been informed of this report. HOO notified    |
| R2DO (Julian).                                                               |
|                                                                              |
| * * * UPDATE 1040EST ON 3/5/02 FROM GEORGE TULLIDGE TO S. SANDIN * * *       |
|                                                                              |
| "At Approximately 1000 on 3/5/02, a Loggerhead turtle was retrieved from the |
| plant intake canal.  The turtle was determined to be in need of              |
| rehabilitation.  Per the plant's turtle permit, the Florida Fish and         |
| Wildlife Conservation Commission (FWCC) was notified."                       |
|                                                                              |
| The NRC resident inspector has been informed of this report. HOO notified    |
| R2DO (Julian).                                                               |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38732       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DAVIS BESSE              REGION:  3  |NOTIFICATION DATE: 02/27/2002|
|    UNIT:  [1] [] []                 STATE:  OH |NOTIFICATION TIME: 15:42[EST]|
|   RXTYPE: [1] B&W-R-LP                         |EVENT DATE:        02/27/2002|
+------------------------------------------------+EVENT TIME:        13:30[EST]|
| NRC NOTIFIED BY:  DALE MILLER                  |LAST UPDATE DATE:  03/05/2002|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHRISTINE LIPA       R3      |
|10 CFR SECTION:                                 |TOM KOSHY            NRR     |
|ADEG 50.72(b)(3)(ii)(A)  DEGRADED CONDITION     |JOSEPH HOLONICH      IRO     |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| IDENTIFICATION OF AXIAL THROUGH-WELD INDICATIONS (REACTOR COOLANT
SYSTEM     |
| PRESSURE BOUNDARY LEAKAGE) ON ONE CONTROL ROD DRIVE MECHANISM
NOZZLE         |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On February 26, 2002, following shutdown for a scheduled refueling outage,  |
| the Davis-Besse Nuclear Power Station performed a qualified visual           |
| examination of the Reactor Vessel head per NRC Bulletin 2001-01.  This       |
| examination revealed evidence of boric acid build up around Control Rod      |
| Drive Mechanism (CRDM) nozzles but was inconclusive due to the previous      |
| known boric acid deposits.  At approximately 1330 hours on February 27,      |
| 2002, Ultrasonic Testing (UT) data identified axial through weld indications |
| on one CRDM.  Engineering evaluation of this data confirmed Reactor Coolant  |
| System pressure boundary leakage exists.  Technical Specification 3.4.6.2.a  |
| states that Reactor Coolant System leakage shall be limited to no pressure   |
| boundary leakage.  As a result this is being reported as a non-emergency,    |
| 8-hour report in accordance with 10CFR50.72(b)(3)(ii)(a), a condition that   |
| resulted in the nuclear power plant, including its principal safety barriers |
| being seriously degraded."                                                   |
|                                                                              |
| The licensee stated that UT inspections are continuing on other nozzles.     |
|                                                                              |
| The licensee plans to notify the NRC resident inspector.                     |
|                                                                              |
| * * * UPDATED AT 1921 EST ON 3/5/02 BY TERRY PLOEGER TO FANGIE JONES * * *   |
|                                                                              |
| "All inspections have been completed at this time. UT data for CRDM nozzles  |
| 1 and 2 (locations H-8 and G-7, respectively) has been evaluated to exhibit  |
| axial indications that represent pressure boundary leakage. This completes   |
| evaluation of the extent of the condition for the report communicated on     |
| February 27."                                                                |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R3DO (John Madera),   |
| NRR EO (David Matthews), and IRO (Tim McGinty) have been informed.           |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Wednesday, March 24, 2021