Event Notification Report for May 11, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           05/10/2000 - 05/11/2000

                              ** EVENT NUMBERS **

36921  36987  36988  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36921       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOK                     REGION:  3  |NOTIFICATION DATE: 04/23/2000|
|    UNIT:  [1] [2] []                STATE:  MI |NOTIFICATION TIME: 06:49[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        04/23/2000|
+------------------------------------------------+EVENT TIME:        03:35[EDT]|
| NRC NOTIFIED BY:  BRIAN MOTZ                   |LAST UPDATE DATE:  05/10/2000|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |MARK RING            R3      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|2     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT 1 TRAIN 'B' ESSENTIAL SERVICE WATER PUMP STARTED AUTOMATICALLY          |
|                                                                              |
| While setting up for testing the Solid State Protection System (SSPS) on     |
| Unit 2, the clearance permit did not anticipate the start of the Unit 1      |
| train 'B' Essential Service Water (ESW) Pump.                                |
|                                                                              |
| "To perform maintenance on the SSPS, a clearance to deenergize the SSPS      |
| cabinets in Unit 2 was written.  The Unit 2 SSPS was in inhibit at this      |
| time.  During the deenergization per this clearance, an automatic start of   |
| the Unit 1 East ESW Pump occurred.  The ESW Pump autostart was not           |
| anticipated or described in the clearance.                                   |
|                                                                              |
| "A Safety Injection (SI) signal through SSPS in either Unit 1 or Unit 2 will |
| cause the ESW Pumps in both units to autostart for the train effected.       |
| Similarly, the removal of power from the control room instrumentation        |
| distribution circuit, which is what occurred here, will cause the autostart  |
| of the ESW pumps.                                                            |
|                                                                              |
| "There were no adverse consequences as a result of the auto pump start and   |
| the actuation was per the system design.  No SI signal was generated."       |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
|                                                                              |
| * * * UPDATE AT 1822 ON 5/10/00 BY WOODS RECEIVED BY WEAVER * * *            |
|                                                                              |
| "The original report was made regarding an automatic start of the Unit 1     |
| East Essential Service Water (ESW) Pump during maintenance, and was          |
| conservatively reported as an automatic actuation of an Engineered Safety    |
| Feature (ESF).  Subsequent reviews of the pump start event and the           |
| reportability requirements of 10 CFR 50.72 and 50.73 have confirmed that     |
| this event is not reportable.                                                |
|                                                                              |
| "In the case of the start of the 1 E ESW Pump, the ESF actuation slave relay |
| never was actuated, but was deenergized and would not have actuated.  No     |
| other portion of the associated ESF actuation circuitry was completed.       |
| Additionally, the ESW pump was not manually started in an emergency response |
| to plant conditions that would have required the pump to be operating.       |
|                                                                              |
| "NUREG-1022, Revision 1,  Event Reporting Guidelines: 10CFR50.72 and 50.73,  |
| Part 3.3.2,  Actuation Of An Engineered Safety Feature Or The RPS,  provides |
| guidance for the reporting requirements of an ESF actuation event as listed  |
| in 10 CFR 50.72 and 50.73.  The NUREG states that actuation of certain       |
| single ESF components of complex systems need not be reported.  Single       |
| components of complex systems, by themselves, usually do not mitigate the    |
| consequences of significant events.                                          |
|                                                                              |
| "Based on the facts that this event was an inadvertent start of a single     |
| component that would not mitigate the consequences of a significant event,   |
| and that the minimum amount of ESF actuation logic, i.e., the slave relay,   |
| did not actuate, the event is not reportable under 10 CFR 50.72 or 50.73.    |
| Therefore, the 4 hour non-emergency report, event number 36921, is being     |
| retracted."                                                                  |
|                                                                              |
| The licensee informed the NRC resident inspector of this report.  The        |
| Operations Center notified the R3DO (CLAYTON).                               |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36987       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FERMI                    REGION:  3  |NOTIFICATION DATE: 05/09/2000|
|    UNIT:  [2] [] []                 STATE:  MI |NOTIFICATION TIME: 21:19[EDT]|
|   RXTYPE: [2] GE-4                             |EVENT DATE:        05/09/2000|
+------------------------------------------------+EVENT TIME:        20:39[EDT]|
| NRC NOTIFIED BY:  DAVID COSEO                  |LAST UPDATE DATE:  05/10/2000|
|  HQ OPS OFFICER:  DOUG WEAVER                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BRENT CLAYTON        R3      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| COMPENSATORY MEASURES TEMPORARILY SUSPENDED DUE TO INCLEMENT WEATHER.        |
| CONTACT THE OPERATIONS CENTER FOR ADDITIONAL DETAILS.                        |
|                                                                              |
| * * * Updated on 5/10/00 to reflect correct reactor mode of cold shutdown    |
| vice hot shutdown * * *                                                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   36988       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  UNIVERSITY OF CONNECTICUTT           |NOTIFICATION DATE: 05/10/2000|
|LICENSEE:  UNIVERSITY OF CONNECTICUTT           |NOTIFICATION TIME: 11:56[EDT]|
|    CITY:  STORRS                   REGION:  1  |EVENT DATE:        05/05/2000|
|  COUNTY:                            STATE:  CT |EVENT TIME:        09:30[EDT]|
|LICENSE#:                        AGREEMENT:  N  |LAST UPDATE DATE:  05/10/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |JOHN ROGGE           R1      |
|                                                |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  KEN PRICE                    |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POSSIBLE LOSS OF A TRITIATED EXIT SIGN                                       |
|                                                                              |
| During final walkthrough for renovation of the Waring Chemistry Building,    |
| one tritiated exit sign appears to be missing.  Eleven signs were collected, |
| but there appeared to be a "spot" on the wall at one exit where it appears a |
| sign had hung.  A search was conducted of the building without finding any   |
| indication of the sign.  There is no inventory of the signs so there is no   |
| positive way of determining that a sign is actually missing.  The sign would |
| by a model 101 by Shield Source Incorporated if it matches the rest of the   |
| signs.  The sign contained 7 curies of tritium on 1/93 and would contain     |
| about 5 curies now.  The university plans to send out a flyer looking for    |
| the sign and provide warning of the hazards involved.                        |
+------------------------------------------------------------------------------+
